NAIAD Hexa Series goes through a carefully designed process from installation to use.
Wastewater is analyzed in the laboratory to determine the treatment process.
At the factory, the modules are assembled according to the analysis. The combined Naiad is transported to the site and installed.
After more than a year of operational data has been collected, management is only a matter of monitoring from the office.

  • Site
    Step
  • In Laboratory

    01. Inspect Site

    ㆍVisit to the site and examine the environment

    ㆍInspect wastewater and establish treatment goals

    02. Analyze and Test in Lab

    ㆍAnalyze wastewater and research on appropriate treatment methods

    ㆍTest based on treatment method combinations.

  • In Factory

    03. Design Modules

    ㆍSelect and combine modules according to the treatment method.

    ㆍIf pre-developed modules are not available, collaborate with HW companies to develop new modules.

    04. Assemble and Test in Factory

    ㆍInitial assembly of modules at the factory.

    ㆍVerify functionality through testing.

  • In Installation
    Site

    05. Transport to the site

    ㆍLoading 6-unit modules into containers.

    ㆍTransport them via truck or ship.

    06. Install the Set and Test On-Site

    ㆍThe set is installed on-site within 3 days

    ㆍConnect wastewater and test out.

  • In Office

    07. Carry out Operation and Monitor

    ㆍOperate and analyze the treatment process for one year(covering all seasons).

    ㆍAccumulate relevant data, monitoring from the office.

    08. Adjust Algorithm and Test Operation

    ㆍFine-tuning algorithms based on the collected data

    ㆍUpdate subsequently with improved algorithms through learning at specified intervals