NAIAD Hexa Series goes through a carefully designed process from installation to use.
Wastewater is analyzed in the laboratory to determine the treatment process.
At the factory, the modules are assembled according to the analysis. The combined Naiad is transported to the site and installed.
After more than a year of operational data has been collected, management is only a matter of monitoring from the office.
-
Site
Step
-
In Laboratory
01. Inspect Site
ㆍVisit to the site and examine the environment
ㆍInspect wastewater and establish treatment goals
02. Analyze and Test in Lab
ㆍAnalyze wastewater and research on appropriate treatment methods
ㆍTest based on treatment method combinations.
-
In Factory
03. Design Modules
ㆍSelect and combine modules according to the treatment method.
ㆍIf pre-developed modules are not available, collaborate with HW companies to develop new modules.
04. Assemble and Test in Factory
ㆍInitial assembly of modules at the factory.
ㆍVerify functionality through testing.
-
In Installation
Site05. Transport to the site
ㆍLoading 6-unit modules into containers.
ㆍTransport them via truck or ship.
06. Install the Set and Test On-Site
ㆍThe set is installed on-site within 3 days
ㆍConnect wastewater and test out.
-
In Office
07. Carry out Operation and Monitor
ㆍOperate and analyze the treatment process for one year(covering all seasons).
ㆍAccumulate relevant data, monitoring from the office.
08. Adjust Algorithm and Test Operation
ㆍFine-tuning algorithms based on the collected data
ㆍUpdate subsequently with improved algorithms through learning at specified intervals